Project portfolio

A track record across 12 kV to 500 kV

Operating as a trusted subcontractor for organisations such as BC Hydro, PG&E, SDG&E, WPE, LEX Engineering and RCMT, MADI has delivered greenfield and brownfield transmission, distribution and substation projects across Canada and the United States.

Featured work

Selected case studies

Live-Line Repair of Damaged 500 kV Tower
500 kVLattice

Live-Line Repair of Damaged 500 kV Tower

Engineered solution to repair a damaged 500 kV lattice tower leg under live-line conditions, restoring structural integrity without outage.

Voltage: 500 kVDeliverables: Assessment · PLS-TOWER · Construction pkg
PG&E Tower Modeling & Line Assessment
115–230 kVPG&E

PG&E Tower Modeling & Line Assessment

Line and structure assessment for reconductoring and shield/OPGW addition across Helms-Gregg, Kerckhoff-Clovis-Sanger, McCall-Sanger and Metcalf-Moss Landing.

Circuits: Single & doubleStructures: Lattice & steel pole
TL697 / TL607 / TL681 Fiber Built Programs
69 kVFiber Built

TL697 / TL607 / TL681 Fiber Built Programs

Strength and clearance assessment plus fiber/ADSS addition across multi-mile 69 kV lines through residential, industrial, highway, rail and river crossings.

Length: 3–5.5 miles eachDeliverables: PLS-CADD · Line Assessment
Project log

Representative projects (2015–2023)

A partial list of recent transmission, distribution and substation engagements.

ProjectDisciplineLocationScopeClient
Ingledow Substation Gantry & Line RelocationTransmissionSurrey, BCNew 230 kV ring bus addition; relocation of 230 kV and 12 kV lines and gantry; lattice/monopole assessment.BC Hydro / WPE
Rate Restoration ProgramTransmissionBritish ColumbiaAssessment and upgrade of multiple lines from 69 kV to 230 kV; reconductoring, pole replacement and lattice strengthening.BC Hydro
138 kV Line Assessment & UpgradeTransmissionSaskatchewanClearance analysis and structure assessment for new ACSR conductor suitability.Confidential utility
Midway–Andrew Line DesignT&D DesignCalifornia≈90 mi new 230 kV D/C line plus 10 mi new 115 kV line into the new Andrew substation.PG&E
Spring T&D Line DesignT&D DesignCaliforniaNew 115 kV connections and looping of Metcalf-Moss Landing No.2 230 kV into the new Spring substation.PG&E
Pole Loading Program (multiple)Pole LoadingSan Diego, CALine modeling, pole-loading analysis and clearance checks across TL6939, TL6924, TL644, TL628, TL627, TL13822, TL13811.SDG&E
Camp Pendleton Fire HardeningT&D DesignSan Diego, CANew structures and conductor along the 69 kV tie line between San Luis Rey and Oceanside substations.SDG&E
Cell Site ProgramStructure AssessmentAnalysis and upgrade of sites for added cell-carrier loading, 138 kV poles to 500 kV lattice towers.Confidential utility
Remediation of TL Clearance ViolationStructure Assessment500 kV clearance remediation via structure raising and conductor re-tensioning.Confidential utility

Project log reflects work delivered as a subcontractor partnering with industry-leading organisations. Client names shown where attributable.

Transmission lines at dusk

Add your project to the log.

Whether it's a single assessment or a full corridor, we'd welcome the opportunity to support your team.