Client: Societe Beninoise d Energie Electrique (SBEE)
Location: Benin
Status: Current, 2024 to present
Overview
Our team is responsible for the complete line and tower design of a new 14 kilometre, 63kV transmission line between Gakpe and Ouidah. The scope covers design of the lattice steel towers and all associated structural analysis to CEB technical standards, delivered using TOWER and PLS-CADD. The design package spans tower geometry, load case analysis and foundation design.

Construction progress on site
Towers designed by TAWARA Group, now erected along the Gakpe to Ouidah corridor. The photographs below were taken during construction supervision visits on the 14 kilometre alignment in Benin.


Services applied
- Line design
- Tower design
- PLS-CADD modelling
- Structural tower analysis