Two linemen working aloft on a wood distribution pole carrying out conductor work

Fiber Attachment Program

Home » Projects » Fiber Attachment Program

Client: San Diego Gas & Electric
Location: California, USA
Status: Completed, 2019 to 2024

Overview

This large-scale program added third-party ADSS fibre optic cable to existing SDG&E structures, changing the combined loading condition on every pole involved. Our team delivered end to end engineering, conducting strength and clearance analyses and managing the process from preliminary design through to as-built documentation, so that the utility retained full structural assurance across the modified assets. Delivered as an independent consultant to KOSMOS, formerly West Power Energy.

Utility worker in high visibility clothing looking up at an overhead distribution pole
Utility worker inspecting an overhead distribution pole.

Services applied

  • Third-party attachment engineering
  • Structural analysis
  • Fibre optic design integration
  • Clearance analysis