Client: San Diego Gas & Electric
Location: California, USA
Status: Current, 2019 to 2025
Overview
Across the SDG&E asset management program, our team performed comprehensive pole loading, strength and clearance assessments on numerous 69kV to 138kV transmission and distribution lines. Deliverables included detailed PLS-CADD models and line assessment reports that established NERC compliance and gave the utility a defensible basis for prioritising replacement and remediation across a large asset base. Delivered as an independent consultant to KOSMOS, formerly West Power Energy.

Services applied
- Pole loading analysis
- Clearance assessment
- Structural analysis
- PLS-CADD modelling

